Outcrop Silver (TSX:OCG) - Moves Towards PEA with Resource Estimate Increase at Santa Ana
Interview with Rob Bruggeman, Director & CEO of Outcrop Silver
Our previous interview: https://www.cruxinvestor.com/posts/outcrop-silver-gold-tsxvocg-12m-drilling-to-expand-high-grade-silver-resource-7129
Recording date: 16th September 2026
Outcrop Silver & Gold Corporation (TSX:OCG) has repositioned its investment case around a more rigorously classified, and larger, mineral resource at its 100%-owned Santa Ana project in Tolima, Colombia. The September 14, 2026 Updated Mineral Resource Estimate reports 29.9 million ounces silver-equivalent (AgEq) Indicated at 518.7 g/t, plus 27.9 million ounces AgEq Inferred at 368.5 g/t - a combined 57.8 million ounces across 13 vein systems, built on 130,006 metres of drilling. Despite total drilling nearly tripling since the 2023 maiden estimate, Indicated ounces grew a comparatively modest 23.5%, because the company applied a stricter classification standard requiring minimum drill-hole support - evidence, management argues, of a more defensible resource rather than a diluted one.
The update comes under new leadership. Rob Bruggeman, an equities analyst by background who previously chaired Aberra Silver through its growth from under $10 million to over $2 billion in market capitalisation, became President and CEO roughly five months ago. He has been explicit that he prioritised a realistic resource over headline size, and has brought in Colombia-based geologist Carlos Torres as Vice President of Exploration.
Grade remains Santa Ana's standout feature: at 518.7 g/t AgEq Indicated, it compares favourably to publicly disclosed primary silver peers, with individual veins - Las Maras, El Dorado, Paraiso and Guadual - running from roughly 590 to 855 g/t AgEq. Metallurgical recoveries of 96.3% silver and 98.5% gold, from a simple gravity-plus-flotation flowsheet, support management's view that initial capital costs can stay low, aided by existing highway, power and water infrastructure at the site.
The next catalyst is a Preliminary Economic Assessment, starting end of September 2026 and expected in early 2027. Management has sized a preliminary target of roughly 800-1,000 tonnes per day, built from combined Indicated and Inferred resources, with a minimum mining width of one metre reflecting Colombia's cost-effective, labour-intensive cut-and-fill mining methods. A pilot plant, estimated at approximately C$5 million, is planned as an execution proof point ahead of any larger build decision.
Exploration upside remains material: twelve known vein systems are not yet included in the resource, and the 17-kilometre mineralized corridor remains open at both ends. At the company's historical drilling productivity of roughly 445 ounces AgEq added per metre, reaching a stated 100 million ounce target would require an estimated 95,000 further metres of drilling - about two-and-a-half years at the current 35,000 metre annual pace.
Ownership and financing support the story:
You May Also Like

How to Trade Stocks and Options Podcast with OVTLYR Live
Christopher M. Uhl, CMA

Børsmorgen & Økonominyhetene
Finansavisen

Inversión Dividendos
Carlos García

CNBC Business News Update
CNBC

The Foundr Podcast with Nathan Chan
Foundr Media

Audio-CD.at Indie Podcasts: Wiener Börse, Sport, Musik (und mehr)
Christian Drastil Comm. (Agentur für Investor Relations und Podcasts)

Bloomberg Daybreak América Latina
Bloomberg

Worldwide Exchange
CNBC
就是愛玩股
玩股網

CNBC's "Fast Money"
CNBC
Community discussion