Purepoint Uranium hits 7.4m at 8,760 cps in first hole at Q24, Dorado
Purepoint Uranium Group (PTU) CEO Chris Frostad tells Proactive that the first drill hole at the Q24 zone on its Dorado project returned 7.4 meters of radioactivity at 8,760 counts per second, with peaks reaching 50,000 counts per second. Frostad describes the result as highly significant given it came from the very first hole drilled in that zone. The Q24 zone is separate from both the Nova and Q23 targets within the broader Dorado project, which Purepoint holds in partnership with ISO Energy across approximately 100,000 hectares in the Athabasca Basin. Frostad highlights that the radioactivity was found at the unconformity, a classic uranium-bearing setting, and that chalcopyrite was identified beneath it — an indicator of the hydrothermal activity that would have mobilized uranium through the area. Assays from the summer drill program are still pending. Frostad says the company is also processing 3D mobile MT geophysical surveys conducted across the entire project over the summer, and will spend the next one to two months interpreting that data alongside drill results. The company does not plan to return to the site with a drill until January, but Frostad says investors should expect a series of updates before then, covering the interpretation of results, planned targets, and the budget being agreed with partner ISO Energy for next year's program. #PurepointUranium #PTU #uranium #AthabascaBasin #Canada #mining #juniorminers #resourcestocks #commodities #investing
You May Also Like

The Real Estate Espresso Podcast
Victor Menasce

Datasets
Visionary

Index
Podcasty SME

손에 잡히는 경제
MBC

硬核比特--人工智能硬核比特币新闻
Meng

Million Dollar Electrician - Sale to Scale For Home Service Pros
Clay Neumeyer

How Money Works
How Money Works

Bloomberg Talks
Bloomberg

Marketplace All-in-One
Marketplace

Marketplace
Marketplace
Community discussion